©2019 by GMI Engineering. 

Jul 8

Words of encouragement & Accuracy results

1 comment

Edited: Jul 11

 

Good Day,

I have great news! I finally received the swage die this morning and made some slugs using JSB monster 25gr pellets. The hollow point works the best. The round nose slugs are all over the place and not worth making again. The slug that comes out the swage die is 5.500mm in diameter which is what FX barrels like.

I shot a group of 6 at 25m and got a group size of my thumb nail. It should also group like this at 100m, but I will test that this coming weekend.

Thank you again for sending me this. I am finally happy that I have a working slug for my FX.

 

Thanks Jan Coetzee. Thank you for your feedback.

Jul 9

 

1 flier maybe.

 

New Posts
  • The SOC dies in .22 cal will be shipped in the next 3 days. 4 kits ordered in OCT-NOV 2019 will be the first to be shipped. 16 Kits ordered in Nov 2019 are undergoing air-hardening & they will be shipped later on. .177 .25 .223 .257 cal dies are under development and the timeline is between December 2019 and January 2020. .253 Cal dies for JD, .22 SOC lightweight slug dies for Peter will be ready soon. Its taking time for the size and design are uncommon and we are making use of the resources to fulfill your requirements. The process normally takes 10 to 15 days, but we are taking time to inspect and test the dies for their functional characteristics. Thank you, Have a great day ahead.
  • These are our prototype slugs made using our new set of dies. 20 slugs in 10 mins. 16.4 grains+-0.2 grains. diameter.218. dies will be available for prebooking in a few days Prototype Smooth curve slugs
  • Hello, We apologise for the delays in the shipment of orders with serial numbers 10038,10039,10040,10041. These orders were supposed to be manufactured and shipped from our Mumbai facility, but due to heavy rains the Industries had to be shut down intermittently as a result the process chain got disrupted and our supply partners had to shut down the operations. We have started the production again, and within 10 days the orders will be dispatched. We ask you for some more time. Thank you, ( https://www.firstpost.com/india/imd-issues-red-alert-for-mumbai-predicts-very-heavy-rains-from-thursday-palghar-thane-and-raigad-also-set-for-heavy-downpour-7359591.html )